Remove existing interlock, add sub road base and road base with compaction, and re-fix same or new (interlock or tile) with compaction and leveling. the work to be handing over by DCM
Remove existing interlock, add sub road base and road base with compaction, and re-fix same or new (interlock or tile) with compaction and leveling. the work to be handing over by DCM